Decision Context and Winning Criteria
Choose PP when chemical resistance, cost efficiency, and lightweight construction dominate. PP's flexural modulus (1.1β1.6 GPa) suits rigid containers; its excellent resistance to acids, bases, and household cleaners makes it ideal for detergent bottles and storage. Choose PC when impact strength, transparency, and temperature stability are criticalβfood-contact containers, microwave-safe housings, and transparent lids. PP's shrinkage (1.5β2.0%) is tighter than PE but requires wall design of 1.5β4 mm to minimize warping. PC handles thinner walls without distortion. Cost-per-unit favors PP by 30β40%; PC justifies premium when durability and optical properties offset material expense. Household mold tooling differs: PP tolerates tighter cooling cycles; PC demands precision cooling to prevent stress-induced cracking.