Decision Context and Winning Criteria
Logistics chair-molds require material selection balancing durability, cost, and environmental exposure. PE excels in chemical resistance and impact absorption—critical for warehouse environments with fuel, lubricant, and corrosive spill exposure. PE's 0.94–0.97 g/cm³ density reduces shipping weight. However, PE's flexural modulus (0.6–1.4 GPa) limits load-bearing stiffness; PC's superior rigidity suits high-stress armrest and backrest zones. Choose PE when chemical resilience and cost dominate; select PC when structural integrity and dimensional stability under sustained load are non-negotiable. Wall thickness tolerance (PE: 2–5 mm optimal) influences mold cavity design and cycle time economics.