Decision Context and Winning Criteria
PE vs PC chair-mold selection hinges on functional demands and regulatory constraints. PE excels in food-contact scenarios: its excellent chemical resistance withstands cleaning agents, oils, and acidic beverages without degradation. Melt temperature range of 180–230°C enables lower processing costs and reduced thermal stress on molds. However, PE's flexural modulus of 0.6–1.4 GPa means chairs lack rigidity—acceptable for stacking or portable designs, problematic for load-bearing furniture. PC prioritizes structural integrity with superior stiffness, enabling thinner walls and lighter assemblies. Choose PE when chemical durability and cost dominate; choose PC when seat deflection or long-term rigidity under repeated loading is non-negotiable. Wall thickness typically 2–5 mm for PE versus 1.5–3 mm for PC reflects stiffness trade-offs.