Decision Context and Winning Criteria
Choose PE when storage containers demand impact absorption, lower material cost, and excellent chemical resistance for aggressive contents (oils, solvents, detergents). PE's 0.6–1.4 GPa flexural modulus suits flexible-wall designs and 2–5 mm wall sections. Select HDPE when rigid structure, dimensional precision, and uniform shrinkage (1.8–2.5%) are critical—particularly for stackable crates or nested containers. HDPE's superior rigidity eliminates deflection under load. Decision rule: PE for cost-sensitive, impact-prone applications; HDPE for structural integrity and tight tolerances. Melt-temperature control differs: PE requires 180–230°C range management; HDPE's narrower window reduces setup variability. Shrinkage uniformity favors HDPE in multi-cavity molds with tight gate-to-cavity distances.