Decision Context and Winning Criteria
PE (density 0.94β0.97 g/cmΒ³, flexural modulus 0.6β1.4 GPa) suits flexible, impact-resistant baskets requiring excellent chemical resistance and lower processing temperatures (180β230Β°C). HDPE provides superior stiffness, environmental stress-crack resistance, and dimensional stability under UV and temperature cyclingβcritical for outdoor durability. Choose PE when flexibility, chemical exposure, and wall thickness 2β5 mm dominate cost sensitivity. Select HDPE when structural rigidity, outdoor weathering resistance, and long-term creep resistance justify higher material cost. Procurement must define basket wall thickness, load-bearing requirements, and UV exposure duration before material lock-in.