Decision Context and Winning Criteria
PE wins when chemical resistance, flexibility, and wall thickness uniformity drive requirements. PE's 180β230Β°C melt window and excellent solvent resistance suit outdoor logistics containers exposed to oils, detergents, and UV environments. ABS prevails when dimensional stability, surface finish, and stiffness (flexural modulus >2.0 GPa vs PE's 0.6β1.4 GPa) are non-negotiable. For household molds, PE's lower shrinkage variance (2.0β3.0%) reduces draft angle demands and secondary finishing. ABS requires tighter process control but delivers superior gloss and color retention. Choose PE for flexible, chemical-resistant outdoor bins; select ABS for rigid, cosmetic-grade household enclosures and logistics fixtures requiring precise snap-fit geometry.