Decision Context and Winning Criteria
Choose PC when optical clarity and high impact resistance are non-negotiable—typical wall thickness 1.5–4 mm, melt processing 280–320°C, shrinkage tightly controlled at 0.5–0.7%. PC excels in transparent food containers, beverage bottles, and safety-critical household items where dimensional stability and light transmission drive value. Choose PP when cost minimization and chemical resistance dominate: PP's shrinkage (1.8–2.5%) requires larger gate systems and cavity compensation, but material cost is 30–40% lower. PP wins for opaque storage bins, caps, and food-contact parts where optical properties are irrelevant. Decision rule: if the mold requires optical gates or light-transmission windows, specify PC; if opacity and solvent resistance matter more than clarity, PP is the procurement target.