Decision Context and Winning Criteria
PC dominates transparent basket applications requiring impact resistance and dimensional stability. PC's flexural modulus of 2.3 GPa and 1.20 g/cm³ density enable thin-wall designs (1.5–4 mm) with superior optical properties and light transmission. PP competes on total cost and chemical resistance to detergents, oils, and alcohols—critical for food-contact baskets. Choose PC when optical clarity, thermal stability above 149°C, and high-impact durability justify 15–25% material cost premium. Select PP for opaque, high-volume, price-sensitive baskets where chemical compatibility and moldability simplify processing and reduce cycle time.