Decision Context and Winning Criteria
Agriculture storage molds require material selection balancing transparency, chemical resistance, and cost efficiency. PC excels in impact protection and optical clarity (critical for visibility in storage containers), with melt temperature 280β320Β°C enabling precise wall thickness control (1.5β4 mm). PP counters with superior shrinkage uniformity (1.8β2.5% vs. PC's 0.5β0.7%), reducing dimensional drift across large storage tank production runs. Choose PC when visibility, impact durability, and thermal stability dominate specifications. Choose PP when shrinkage consistency, production volume scaling, and material cost directly influence margin. Procurement teams must weigh tooling complexity (PC's lower flow requires optimized gate design) against cycle-time economics (PP's faster cooling).