Decision Context and Winning Criteria
PC outperforms PE in optical transparency and impact strength—critical for retail crates requiring product visibility and durability in outdoor handling. PC's flexural modulus of 2.3 GPa supports rigid wall structures (1.5–4 mm) without flex deformation during stacking. However, PE's lower material cost and superior flow characteristics reduce mold complexity and cycle time. Choose PC when brand visibility and structural integrity justify 15–25% material premium; select PE when cost containment and simplified processing override transparency needs. Outdoor UV exposure demands stabilizer additives for both materials, though PC's poor solvent resistance limits cleaning chemical compatibility. PE maintains better chemical tolerance for warehouse environments.