Decision Context and Winning Criteria
Select PC when retail products demand optical clarity, high impact resistance, and wall thicknesses of 1.5–4 mm with superior aesthetic finish. PC's flexural modulus of 2.3 GPa supports rigid structural components in transparent housings, cosmetic containers, and protective covers. Choose HDPE when outdoor exposure, chemical resistance, and cost optimization dominate—HDPE resists solvents and UV degradation far better than PC's poor solvent resistance. HDPE also tolerates higher shrinkage (1.8–2.5%) in non-precision applications. For household outdoor molds, the decision hinges on whether transparency justifies PC's premium pricing (typically 30–40% higher) and solvent vulnerability, or whether HDPE's environmental durability and recyclability (10–25% PCR blends available) align with sustainability mandates and budget constraints.