Decision Context and Winning Criteria
Select PC when retail chair designs require optical clarity, high impact absorption, or transparent seat backs—typical in modern showroom displays. PC's 2.3 GPa flexural modulus supports 1.5–4 mm wall thicknesses without reinforcement. Choose HDPE when cost minimization, chemical resistance to cleaning agents, or post-consumer recycled content (PCR blends 10–25%) drives procurement. HDPE excels in high-volume, opaque structural components. Winning criteria: PC wins on durability and aesthetics; HDPE wins on total cost of ownership and sustainability compliance. Evaluate mold cycle time (PC: longer due to 280–320°C processing), shrinkage control (PC: 0.5–0.7%), and surface finish requirements before final material commitment.