Decision Context and Winning Criteria
PC dominates logistics chair applications requiring impact durability and optical transparency; HDPE suits cost-sensitive, heavy-duty load-bearing designs. PC's flexural modulus of 2.3 GPa ensures rigid seat structures with wall thicknesses of 1.5–4 mm, critical for driver safety and long-term shape retention. HDPE excels in chemical-resistant environments and outdoor logistics facilities. Choose PC when transparency, impact strength, and dimensional stability justify 15–25% material cost premium. Select HDPE when procurement budgets prioritize volume pricing, chemical exposure dominates (solvents, fuels), and optical properties are irrelevant. Mold cavity pressure tolerance differs: PC requires tighter gate design due to 280–320°C melt sensitivity; HDPE permits broader processing windows, reducing tooling complexity.