Decision Context and Winning Criteria
Choose PC when chair design requires optical clarity, impact absorption, or thermal stability above 100°C. PC's flexural modulus of 2.3 GPa and 0.5–0.7% shrinkage enable tight-tolerance transparent backrests or armrest connectors. Select HDPE when cost minimization and chemical resistance dominate—structural frames, seat bases, and outdoor exposure components benefit from HDPE's lower resin cost and UV resilience. PC excels in food-contact surfaces (food processing chair applications); HDPE suits harsh chemical environments. Define winning criteria early: optical performance, load-bearing requirements, thermal exposure, and total landed cost determine material assignment per mold cavity or sub-assembly.