Decision Context and Winning Criteria
PC operates at 280–320°C melt temperature versus ABS's lower processing window, directly impacting cycle time and energy cost. For retail chairs, PC's 2.3 GPa flexural modulus and exceptional impact resistance justify higher resin cost when transparency, UV stability, or premium aesthetics drive end-use value. ABS wins on injection flow and color acceptance, reducing gate design complexity. Choose PC when chair frames require optical clarity, outdoor durability, or anti-bacterial surface properties. Select ABS when rapid cycles, cost-sensitive retail segments, or opaque finishes dominate procurement requirements. Shrinkage differential—PC at 0.5–0.7% versus ABS's tighter range—affects mold compensation strategy and dimensional hold.