Decision Context and Winning Criteria
Retail basket-mold procurement requires balancing transparency, durability, and unit economics. PC dominates when optical clarity and impact strength are critical—typical wall thicknesses of 1.5–4 mm benefit from PC's flexural modulus of 2.3 GPa and superior dimensional stability. ABS wins on tooling cost and cycle time due to lower melt viscosity and faster cooling. Choose PC when baskets require transparent inspection windows, handles absorbing repeated drops, or food-contact surfaces demanding chemical inertness. Select ABS for opaque utility baskets where cost per unit and production speed override transparency. Define acceptance criteria: PC requires ±0.3% dimensional tolerance at 0.6% shrinkage; ABS tolerates ±0.5% variance. Establish material-specific gate criteria before RFQ to prevent mid-production switching.