Decision Context and Winning Criteria
Logistics chair mold selection hinges on end-use environment and cost tolerance. PC's 280–320°C melt temperature and 0.5–0.7% shrinkage demand precise thermal control but ensure dimensional stability critical for load-bearing chair frames. ABS processability advantage reduces cycle time and scrap, lowering per-unit mold cost. Choose PC when chairs face chemical exposure, require optical inspection windows, or demand impact resistance exceeding 2.3 GPa flexural modulus. Select ABS when production volume justifies lower tooling investment and chemical resistance remains non-critical. For logistics applications with temperature cycling stress, PC's superior heat stability outweighs ABS's processing ease.