Decision Context and Winning Criteria
PC's melt temperature window of 280–320°C and 0.5–0.7% shrinkage demand precise mold temperature control and gate design; ABS flows more freely, reducing scrap in high-cavity tooling. For food-contact applications, PC's inherent clarity and anti-bacterial properties justify higher material cost (~15–25% premium). Outdoor household goods favor PC's superior UV and chemical resistance, though ABS excels in low-temperature impact scenarios. Winning criteria: optical transparency (choose PC), complex thin-wall geometry with tight tolerances (choose PC at 1.5–4 mm wall), budget-constrained commodity housewares (choose ABS), and rapid color changeovers (choose ABS). Evaluate mold amortization: PC tooling costs 10–20% more due to cooling line complexity, but material cost-per-part offsets in medium to high volumes.