Decision Context and Winning Criteria
PC vs ABS selection hinges on three procurement dimensions: optical performance, manufacturing speed, and total cost ownership. PC's 2.3 GPa flexural modulus and exceptional impact strength suit transparent outdoor baskets exposed to UV and thermal cycling. ABS excels in opaque, high-volume runs where flow characteristics reduce cycle time and material waste. PC's melt window (280–320°C) demands precise temperature control; ABS tolerates wider processing windows. For food-contact applications, PC's antimicrobial and anti-pollution properties justify premium pricing when transparency or durability under outdoor conditions is non-negotiable. ABS wins when cost-per-unit and production velocity outweigh transparency and long-term weathering performance.