Decision Context and Winning Criteria
Select HDPE when agriculture or household applications demand dimensional stability, chemical resistance, and structural integrity—such as pesticide containers, water tanks, and rigid storage bins. HDPE's 2.0–3.0% shrinkage and 0.8–1.5 GPa flexural modulus ensure predictable tooling and minimal post-mold distortion. Choose PE (LDPE/LLDPE) when impact toughness at low temperatures, flexibility, and cost minimization outweigh rigidity needs—typical for bags, flexible tubing, and protective wrapping. HDPE molds require wall thickness 2–5 mm for optimal gate balance and cooling; PE tolerates thinner sections. Decision criteria: HDPE wins on chemical compatibility and mold precision; PE wins on toughness-to-cost ratio and low-temperature impact performance.