Decision Context and Winning Criteria
Choose HDPE when low-temperature impact resistance and chemical compatibility dominate. HDPE's linear molecular structure, minimal lateral branching, and 0.94–0.97 g/cm³ density enable superior toughness in outdoor and refrigerated food-beverage applications. Select PC when optical transparency, higher rigidity (typically 2.3–2.4 GPa flexural modulus), and dimensional stability outweigh cost. HDPE excels in flexible wall designs (2–5 mm typical), while PC suits rigid, thin-wall precision containers. Cost trade-off: HDPE resin is 30–40% cheaper; PC justifies premium for clarity-critical applications like beverage bottles or pharmaceutical packaging where consumer perception requires glass-like appearance.