Decision Context and Winning Criteria
Choose ABS when dimensional tolerance and surface finish are non-negotiable. ABS's 0.4–0.7% shrinkage and flexural modulus of 2.1–2.8 GPa enable tight-tolerance agricultural connectors, valve housings, and outdoor electrical enclosures requiring post-mold plating. ABS processes at 220–260°C with wall thicknesses of 1.5–3 mm, supporting precision-critical designs. Choose PP when cost minimization and chemical resistance dominate. PP's lower raw material cost and superior resistance to fertilizers, pesticides, and UV-stabilized outdoor exposure make it ideal for large-volume agricultural tanks, irrigation fittings, and household outdoor storage bins. Decision hinges on tolerance stack-up, surface finish requirements, and volume economics.