Decision Context and Winning Criteria
Choose ABS when tight dimensional tolerances (±0.1–0.2 mm) and structural rigidity are non-negotiable—critical for food-contact lids, beverage caps, and stackable household containers. ABS's flexural modulus of 2.1–2.8 GPa prevents warping under thermal cycling. PE wins when cost per unit drives procurement: 15–25% material cost savings and faster cycle times offset lower stiffness. Food-beverage applications requiring FDA compliance favor ABS's formulated grades; outdoor household goods exposed to UV and weathering benefit from PE's superior environmental stress-crack resistance. Define acceptance criteria upfront: tolerance stack, chemical exposure duration, temperature cycling range, and cost ceiling per cavity.