Decision Context and Winning Criteria
ABS wins when dimensional precision and structural rigidity dominate procurement requirements. ABS melt temperature 220β260Β°C enables tight wall tolerances (1.5β3 mm) with shrinkage controlled to 0.4β0.7%, critical for snap-fit assemblies, electrical housings, and appliance bezels. PE excels in cost-per-unit and chemical resistance for flexible seals, tubing, and non-load-bearing trim. Select ABS for applications requiring flexural modulus β₯2.1 GPa and aesthetic surface finish (gloss grades available). PE suits high-volume, low-margin commodity parts where Β±2% dimensional tolerance is acceptable and material cost drives decision. Evaluate flame-retardant ABS (UL-94 V0 at low thickness) against PE's inherent flammability and wax-like surface finish for brand compliance.