Decision Context and Winning Criteria
Select ABS when dimensional stability and cost control dominate: ABS shrinks 0.4–0.7%, enabling tighter tolerances on nested storage lids and stackable containers without secondary machining. Choose PC when impact resistance and optical clarity are critical—PC absorbs higher energy without crazing, essential for transparent storage boxes in retail environments. ABS melt temperature 220–260°C reduces cycle time and energy cost versus PC's 260–300°C range. For opaque, cost-sensitive storage (bulk bins, industrial crates), ABS wins. For premium, transparent, or drop-tested consumer packaging, PC justifies higher material and processing cost. Evaluate end-use: warehouse storage favors ABS; retail-facing transparent containers demand PC.