Baseline Definition and Benchmark Scope
PC stackable-crate molds for retail logistics in the Middle East encompass single-cavity or multi-cavity (2β4 cavity) configurations with wall thicknesses of 2.0β3.5 mm to support stacking loads exceeding 1 ton per unit. PC's 2.3 GPa flexural modulus and high-impact resistance (Izod 12β16 kJ/mΒ²) are critical for repeated stacking cycles. This benchmark covers mold steel (H13 or P20), cavity count, gate design, ejection systems (air and cam-operated suction cups), and cooling-line layout optimized for PC's narrow processing window (280β320Β°C melt). Shrinkage allowance of 0.5β0.7% and density 1.20 g/cmΒ³ are factored into cavity sizing. Cycle time ranges 45β65 seconds per shot, dependent on wall thickness and cavity count.