Baseline Definition and Benchmark Scope
HDPE stackable-crate molds in Southeast Asia are defined by wall thickness 2.5β4.5 mm, cavity counts 4β8, and nesting geometry requiring tight draft angles (1.5β2.5Β°) for stacking integrity. HDPE's density range 0.94β0.97 g/cmΒ³ and shrinkage 2.0β3.0% establish mold compensation tolerances Β±0.08β0.12 mm per 25 mm. Baseline cycle time: 45β65 seconds at melt temperature 200β220Β°C. This benchmark covers molds produced in Thailand, Vietnam, and Malaysia for retail distribution networks, excluding prototype or ultra-low-volume tooling.