Baseline Definition and Benchmark Scope
PP nestable-basket molds in Southeast Asia are benchmarked for retail units ranging 2β8 L capacity with wall thickness 1.5β3 mm. Baseline mold steel is P20 or equivalent, cavity count 4β16, and gate design optimized for uniform PP flow at 220β250Β°C melt temperature. Shrinkage tolerance window is Β±1.7% (mid-range 1.5β2.0%), critical for nesting geometry. Cycle time baseline: 35β55 seconds per shot. Mold life expectancy: 500,000β800,000 cycles before wear-induced dimensional drift. Benchmark scope includes tooling design, first-article inspection (FAI) protocols, and post-mold UV-stabilizer verification, since unfilled PP lacks inherent UV resistance. Regional lead-time baseline: 10β14 weeks from order to first-article delivery.