Baseline Definition and Benchmark Scope
PP crate molds in North America target 1.5β4 mm wall thickness for structural stacking loads typical of retail distribution. Baseline scope includes mold steel (P20/420 standard), cavity count (2β8), and production volumes 500Kβ5M cycles annually. PP processing requires melt temperatures 200β280Β°C with shrinkage compensation 1.5β2.0% integrated into cavity design. Density 0.90 g/cmΒ³ reduces part weight versus HDPE, critical for logistics cost. Benchmark excludes UV-stabilized compounds (add 8β12% material cost) and covers unfilled PP only. Regional variance reflects North American lead-time norms (12β18 weeks tooling), labor costs, and cooling-water infrastructure differences between Mexico, Canada, and US mold shops.