Baseline Definition and Benchmark Scope
HDPE outdoor crate molds in Southeast Asia are defined by wall thickness 2β5 mm, typical cavity counts 4β16, and shot weights 400β2,500 g. Baseline mold steel grades: P20 hardened to 38β42 HRC for core/cavity. HDPE's superior low-temperature impact (vs. PP) and excellent chemical resistance establish durability thresholds: flexural modulus 0.8β1.5 GPa, density 0.94β0.97 g/cmΒ³. Benchmark scope covers single-cavity and multi-cavity molds, injection pressure 60β100 MPa, and packing pressure 30β50 MPa. Regional variance in ambient humidity (70β95% RH) and temperature (25β32Β°C) affects shrinkage compensation: HDPE exhibits 2.0β3.0% linear shrinkage, requiring mold cavity oversizing. Scope excludes gas-assist and insert-molding variants.