Baseline Definition and Benchmark Scope
HDPE cold-chain crate molds for African retail logistics require wall thickness of 2.5–4.5 mm to balance structural rigidity with cycle-time efficiency. HDPE's density range (0.94–0.97 g/cm³) and flexural modulus (0.8–1.5 GPa) support stacking loads typical in refrigerated distribution. This benchmark covers single-cavity and 2–4 cavity configurations serving crate volumes of 30–60 liters. Scope includes mold steel grade (P20/1.2311 standard), cooling-circuit design for thermal uniformity, and gate/runner optimization to minimize shrinkage variance within HDPE's 2.0–3.0% envelope. Regional baseline excludes secondary operations; focus is molded-part quality and mold lead-time performance specific to African supply chains.