Baseline Definition and Benchmark Scope
This benchmark covers single-cavity and multi-cavity PE checkout-basket molds (2β5 mm wall thickness) produced for North American retail distribution. PE's density range (0.94β0.97 g/cmΒ³) and 2.0β3.0% shrinkage define mold cavity tolerances and gate placement. Baseline scope includes mold steel grade (P20 or H13), cooling-circuit design for PE's optimal 180β230Β°C melt temperature, and ejection-pin placement to prevent sink marks on thin-wall sections. Benchmarks exclude custom graphics inserts, metal-insert assemblies, and secondary operations. Regional baseline assumes ISO 13849-1 tooling standards and North American lead-time expectations (12β16 weeks for cavity design, 8β12 weeks for fabrication).