Baseline Definition and Benchmark Scope
HDPE checkout-basket molds in the Middle East are defined by wall thickness 2β5 mm, stripper-plate ejection systems, and outside-center hot-tip gating. Baseline cycle time is 7 seconds, derived from HDPE's 180β230Β°C melt temperature and 0.94β0.97 g/cmΒ³ density. Shrinkage tolerance is 2.0β3.0%, critical for basket dimensional stability. This benchmark covers cavity counts 4β16, mold steel grades (P20/NAK80), and regional lead-time windows (12β16 weeks from order to shipment). Quality scope includes dimensional accuracy (Β±0.2 mm), surface finish (Ra 1.6β3.2 Β΅m), and gate-vestige acceptance limits. Baseline excludes ENP or flash chrome plating; these are quoted separately.