Baseline Definition and Benchmark Scope
This benchmark covers single-cavity and multi-cavity HDPE checkout-basket molds (capacity 25–50 L) manufactured in Latin America. Reference specifications: HDPE melt temperature 180–230°C, shrinkage 2.0–3.0%, wall thickness 2–5 mm for structural ribs and handles. Baseline mold complexity assumes family tooling with 1–2 cavity configurations, standard ejection systems, and cooling channels optimized for HDPE's 0.94–0.97 g/cm³ density. Scope excludes custom texture, multi-material inserts, or automation-ready features. Benchmarks reflect Argentina, Mexico, and Brazil suppliers with ISO 13485 or equivalent certification and minimum 5-year HDPE production history.