Baseline Definition and Benchmark Scope
PE retail basket molds are classified by cavity count (single to 16-cavity), wall thickness (2.5β4.5 mm typical), and production volume (50kβ500k units annually). European baseline assumes injection temperature 180β230Β°C, mold steel grade H13, and cycle times 35β65 seconds depending on cavity density. PE's shrinkage range (2.0β3.0%) directly impacts gate design and cooling-channel spacing. Basket geometry demands ribbing and undercut management to compensate for PE's flexural modulus weakness (0.6β1.4 GPa vs. PP's 1.2β1.8 GPa). Benchmark scope covers single-cavity prototypes through high-volume multi-cavity production, including cold-runner and hot-runner configurations. Regional lead-time baseline: 10β14 weeks for tool build, 2β4 weeks for first-article sampling.