Baseline Definition and Benchmark Scope
HDPE storage molds for Latin America are defined by wall thickness 2β5 mm, cavity counts 2β16, and cycle times 45β90 seconds depending on wall mass and cooling efficiency. Baseline scope covers mold steel (P20/NAK80), cooling channel design optimized for HDPE's 180β230Β°C melt temperature, and structural ribs for stiffness without exceeding flexural modulus limits (0.8β1.5 GPa). Regional benchmarks account for Mexico, Brazil, and Colombia supply chains. HDPE's 0.94β0.97 g/cmΒ³ density and 2.0β3.0% shrinkage require tighter gate design and cooling uniformity than PP. Tooling includes ejector pins, lifters for undercuts, and venting to prevent gas traps in thick-wall sections.