Baseline Definition and Benchmark Scope
PE stackable crate molds are multi-cavity, modular-stack designs with typical wall thickness 2.5β4.0 mm to balance PE's low stiffness against impact loads during stacking. Baseline scope covers single-stack, 4β8 cavity configurations for crates 400β600 mm length. PE processing window (melt temp 180β230Β°C) is narrower than PP, requiring tighter temperature control and affecting cycle consistency. Shrinkage targets 2.0β3.0%, density 0.94β0.97 g/cmΒ³. Benchmark includes mold material (hardened steel, H13), cavity count, cooling-line design, ejection systems (air pins, cam-operated suction cups), and secondary operations (deburring, stacking tests). Regional scope: US East Coast, Midwest, and Mexico nearshore suppliers.