Baseline Definition and Benchmark Scope
This benchmark covers ABS stackable crate molds designed for modular, stack-mold construction in North American injection molding facilities. ABS shrinkage of 0.4β0.7% requires tighter cavity tolerances than commodity plastics, directly impacting mold design complexity and lead-time. Baseline scope includes single-cavity and multi-cavity stack configurations (2Γ4 and 4Γ4 layouts common for dairy and logistics containers), wall thicknesses 1.5β3 mm, and automated ejection systems (air-ejection with suction cups or cam-operated actuators). Mold materials typically DIN 1.2738 or equivalent hardened steel. Benchmark excludes prototype or soft-tooling runs and applies only to production-intent ABS tooling with cycle targets of 2.5β3.5 seconds per shot.