Baseline Definition and Benchmark Scope
This benchmark covers PP nestable-basket molds for logistics applications in North America, targeting wall thicknesses of 1.5β3.5 mm and cavity counts of 4β16. PP shrinkage of 1.5β2.0% directly impacts dimensional stack-ability; mold cavity design must account for this tolerance band. Baseline part weight ranges 80β250 g per unit. Mold cost scope includes cavity inserts, stack-mold center section, ejection systems (air pins, suction cups), and thermal controls for PP melt temperatures (220β280Β°C). Lead-time baseline: 8β14 weeks for new tooling; 2β4 weeks for modifications. Benchmark excludes secondary operations and material surcharges beyond base PP resin cost ($0.95β$1.20/kg in North America).