Baseline Definition and Benchmark Scope
This benchmark covers PC nestable-basket molds for logistics and material-handling applications in North America, with wall thicknesses 1.5β4 mm and part weights typically 200β800 g. PC's melt temperature range (280β320Β°C) and shrinkage tolerance (0.5β0.7%) directly impact cooling-system design and cycle-time variability. Baseline scope includes mold construction (cavity count 2β8), cooling-channel optimization, and part-ejection reliability for nested stacking. Benchmark data reflects injection-molding facilities certified to ISO 9001 and capable of maintaining dimensional tolerances Β±0.1β0.2 mm. Lead-time measurement begins at order confirmation and ends at first-article inspection (FAI) sign-off. Regional baseline excludes expedite surcharges and accounts for standard North American supply-chain logistics (3β5 day inland transit).