Baseline Definition and Benchmark Scope
PP logistics crates in Latin America are standardized to 40β80 g per unit, processed at 220β280Β°C mold temperature with wall thickness 2.0β3.5 mm to balance stiffness (flexural modulus 1.1β1.6 GPa) against cycle-time efficiency. Baseline cavity count ranges 2β8 cavities per mold, with single-cavity tooling at $1,170β$1,600 and 2Γ8 stack configurations at $2,000β$2,800. Shrinkage allowance 1.5β2.0% directly impacts gate location and cooling-channel design. Regional benchmarks exclude post-mold operations; UV stabilizer additives (+$0.08β$0.15/kg) are mandatory for outdoor logistics applications. Lead-time baseline: 6β9 weeks from order to first articles in Mexico/Brazil; 10β14 weeks in Colombia/Peru due to secondary-supplier dependencies.