Baseline Definition and Benchmark Scope
PC cold-chain crate molds are defined by wall thicknesses of 2.0β3.5 mm, cavity counts of 2β4, and structural requirements for stacking load resistance up to 50 kg per crate. PC's 0.5β0.7% shrinkage and 1.20 g/cmΒ³ density establish tight dimensional tolerance bands (Β±0.3 mm). Mold bases typically range 800Γ600Γ400 mm. European benchmarks exclude post-mold finishing and assume standard cooling-line O-ring configurations. Baseline includes cavity pressure monitoring (60β90 MPa holding pressure) and melt-temperature control at 300β310Β°C. Scope covers single-cavity through 4-cavity progressive molds; stack molds with thermal gates are excluded from this baseline.