Baseline Definition and Benchmark Scope
PE checkout basket molds in Europe are standardized for high-volume logistics applications with wall thicknesses of 2.5β4.5 mm to balance stiffness and cycle efficiency. PE's low flexural modulus (0.6β1.4 GPa) necessitates ribbed reinforcement in handle zones and base structures. Baseline mold cavity count ranges 2β4 cavities per tool. Processing window: melt temperature 180β230Β°C, mold temperature 40β60Β°C. Shrinkage compensation targets 2.0β3.0% linear. Cycle time baseline: 45β65 seconds including cooling and ejection. This scope excludes multi-layer or color-injection variants and assumes standard steel (P20/1.2311) mold construction.