Baseline Definition and Benchmark Scope
This benchmark covers single-cavity and multi-cavity PC checkout basket molds (typical wall thickness 1.5β3 mm) produced by European ISO 13485βcertified facilities. PC processing requires melt temperatures of 280β320Β°C and tight shrinkage tolerance windows (0.5β0.7%) to maintain dimensional accuracy in stacked logistics applications. Baseline scope includes mold steel (H13/1.2344 or equivalent), cooling circuit design for uniform thermal distribution, and ejection systems rated for PC's 2.3 GPa flexural modulus. Excluded: soft-touch coatings, insert molding, and post-mold assembly. Reference cavity count: 4β8 cavities; typical shot weight: 80β250 g. Benchmark applies to molds with lead-times of 8β14 weeks and production volumes of 500kβ2M parts annually.