Baseline Definition and Benchmark Scope
ABS basket-mold benchmarks for Southeast Asia define performance across molds producing logistics containers with wall thickness 1.5–3 mm and typical cavity counts 2–8. Baseline scope includes mold lead-time from order to first article (FAI), cavity-to-cavity tolerance stack (±0.05–0.10 mm), and ABS-specific processing windows: melt temperature 220–260°C (target 245°C), mold temperature 25–70°C, drying requirement 80–90°C for ≥2 hours to achieve <0.1% moisture content. Regional baseline assumes standard cooling channels, steel (P20/H13) cavity inserts, and no exotic surface finishes. Basket-mold structural load cases include stacking forces and impact resistance, requiring dimensional stability within ABS's 0.4–0.7% shrinkage range. Benchmarks exclude expedited tooling, prototype iterations, and custom gating designs.