Baseline Definition and Benchmark Scope
This benchmark covers PE injection-molded outdoor logistics baskets produced in Latin American facilities (Mexico, Brazil, Colombia). Scope includes molds with cavity counts 2β8, shot weights 800β3,500 g, and cycle times 45β90 seconds per shot. PE material specifications: melt temperature 180β230Β°C, shrinkage tolerance 2.0β3.0%, wall thickness 2β5 mm. Outdoor basket applications demand chemical resistance (PE's strength) and flexural stiffness (0.6β1.4 GPaβPE's weakness vs. PP). Benchmark captures lead-time from order to first article (4β8 weeks), mold steel grade (P20 or equivalent), and cooling circuit complexity. Excludes in-mold labeling, in-mold coating, or post-mold decoration; baseline is plain PE part geometry.