Baseline Definition and Benchmark Scope
HDPE stackable-crate molds for food-beverage logistics operate under rigorous structural and thermal demands. Benchmark scope covers molds producing crates with 2–5 mm wall thickness, designed for HDPE's density range (0.94–0.97 g/cm³) and flexural modulus (0.8–1.5 GPa). European baseline includes cavity counts (4–16 cavities typical), stack-mold architecture with air ejection and cam-operated actuators, and production volumes 500K–2M units annually. HDPE's excellent chemical resistance and low-temperature toughness—outperforming PP in cold-chain environments—define mold cooling, gate design, and ejection-force requirements. Benchmarks exclude prototype/short-run tooling; focus is production-grade molds with proven cavity balance and repeatable shrinkage control.