Baseline Definition and Benchmark Scope
PP outdoor food-beverage crate molds in Africa are defined by 2β4 mm wall thickness, multi-cavity layouts (4β8 cavities), and integrated stacking ribs. Baseline scope covers mold steel grade P20/H13, cooling line diameter 10β14 mm, and UV-stabilizer package integration. PP's 1.5β2.0% shrinkage range demands Β±0.05 mm cavity tolerance control. Cycle time baseline: 8β11 minutes per shot (cooling dominates due to wall mass). Lead-time baseline: 10 weeks nominal from order to first article inspection (FAI). Cost baseline: $20,000β$28,000 for single-cavity tooling; multi-cavity adds $4,000β$6,000 per additional cavity. Regional variance: South African and Egyptian suppliers typically hit these targets; West African shops add 2β3 weeks due to material and component sourcing delays.