Baseline Definition and Benchmark Scope
HDPE checkout basket molds in North America are defined by cavity count (typically 2β8 cavities), wall thickness 2β5 mm, and estimated cycle times of 7β12 seconds per shot. HDPE's shrinkage range of 2.0β3.0% and density 0.94β0.97 g/cmΒ³ establish baseline dimensional accuracy targets. Mold complexity includes stripper-ring or stripper-plate ejection systems with internal pneumatic actuation, center hot-tip gating, and thermal controls to manage HDPE's melt window (180β230Β°C). This benchmark covers mold manufacturing lead-time, tooling cost per cavity, first-article inspection (FAI) compliance, and production cost per part. Regional scope includes US, Canada, and Mexico suppliers serving food-beverage OEMs.