Baseline Definition and Benchmark Scope
HDPE crate-mold benchmarks in Latin America cover injection-molded containers with wall thickness 2.5β4.5 mm, targeting stacking-load capacity and low-temperature impact resistance. HDPE's 0.94β0.97 g/cmΒ³ density and 2.0β3.0% shrinkage define mold compensation tolerances (Β±0.15β0.20 mm). Melt temperature 180β230Β°C and cycle times 45β75 seconds establish baseline productivity. Scope includes material cost, mold amortization, labor, and regional logistics. Quality gates address dimensional stability, surface finish (Ra 1.6β3.2 Β΅m), and impact strength at 0Β°C. Benchmarks exclude secondary operations and assembly labor.